"REDUCCION DE TIEMPO IMPRODUCTIVO Y COSTOS DE OPERACIÓN A UN PROCESO DE FABRICACION DE BOLSAS DE PAPEL UTILIZADAS EN LA INDUSTRIA DEL CEMENTO"

By: Contributor(s): Material type: TextPublication details: Nueva San Salvador : Universidad Técnica Latinoamericana, 1998.Subject(s): DDC classification:
  • 676.3   S198r
Online resources:
List(s) this item appears in: Ingeniería Industrial
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
No physical items for this record

There are no comments on this title.

to post a comment.